Search for another town










Free U.S. delivery 7 to 10 days after you order
Gantt, Alabama Map Art
Building by building, with labeled streets and shaded relief.
12" x 18" Archival Matte Print
A Map of Home. A Work of Art.
Explore Gantt, Alabama from a whole new perspective. Created using aerial imagery and detailed geographic data, this map captures Gantt building by building, with labeled streets, familiar landmarks, and shaded topographical relief that highlights the natural contours of the landscape.
Combining modern data with the timeless character of a vintage atlas, this map is just as interesting up close as it is beautiful on the wall. Whether you grew up in Gantt, spent memorable years there, or call it home today, this unique map is a great way to celebrate a place that means something to you. Zoom in on the preview to look for your street, and then order a print to put your memories on the wall.

Three ways to hang it

Unframed archival matte, a black wood frame or a white wood frame.
Up close
Geography Worth Displaying
This map was created using accurate cartographic data and authoritative geographic sources, including the U.S. Geological Survey and the Census Bureau. The map brings together terrain, waterways, roads, and building detail. The majority of the streets are labeled, houses are accurately depicted, and the topography is derived from government sources. Combining local data with carefully composed color and shading leads to this beautifully detailed Gantt artwork for your wall.
Rather than simply showing street outlines, we’ve included as many of the street names as we could reasonably fit on the map while keeping their names legible. Zoom in on the high resolution preview to see exactly what’s on the map. We truly set out to create a statement piece for anyone who loves Gantt. So whether it’s for you, or a gift for someone you love, we hope this map of Gantt brings back fond memories.
Find your street
Names on the Gantt map
Every name below is printed on this map. Look for your street, your school, the park where you played, or the pond down the road.
Places and landmarks1
- Able Cemetery
Streets and roads35
- Spaulding Avenue
- Church Street
- Power House Road
- Fourth Avenue
- Hatcher Drive
- Lucy Road
- Recreation Drive
- Jeff Street
- Powerhouse Road
- Okey Street
- Branner Road
- Central Street
- Kirkpatrick Road
- Central Avenue
- Second Avenue
- Christine Avenue
- Tori Street
- Gantt Red Level Road
- Commerce Street
- Main Street
- Rawls Avenue
- Able Avenue
- Third Avenue
- Rawls Drive
- Rene Drive
- Linda Street
- Chance Avenue
- First Avenue
- Rene Street
- Deer Run Road
Show all 35 streets
- Rawls Street
- Jacks Drive
- Hatcher Avenue
- Victoria Street
- Cemetary Street
Names are listed as they appear on the printed map. Zoom into the product photos to find them.
About Gantt, Alabama
Gantt was a busy river town that lived mostly on lumber. Timber cut there floated down to Pensacola, Florida. The first dam on the Conecuh River rose in 1899 to move logs to market. A power plant on the dam in 1920 lit Gantt before other county towns. The lights went out at 10:00 each night.
Keep exploring Alabama
Gantt is one of 675 Alabama towns we've mapped. Every dot on the map is a print of its own.
The search covers every state, Alabama first.
Near Gantt
Order 2 or more town maps and save 10%. Shown in the size and finish you picked above, so they hang as a set.
- Straughn 12" x 18" / Archival Matte Print $39.99
- Heath 12" x 18" / Archival Matte Print $39.99
- River Falls 12" x 18" / Archival Matte Print $39.99
More maps nearby: Andalusia, Red Level, Sanford, Dozier and Libertyville.
The art of mapping a place
How This Map Was Made
Real places. Remarkable detail. Discover the layers that turn geographic data into a map of home.

The view from above
Aerial imagery reveals the character of the land: woodland, open fields, and the patterns of a place.

The shape of the land
Elevation data brings hills, valleys, and subtle changes in the landscape into view.

The details of home
Roads, waterways, and building footprints come together to make the map feel unmistakably local.

Geography becomes art
Considered color, shading, and typography bring the layers together in a map made for your wall.
Process illustrated with Mendon, Massachusetts. Aerial imagery: USDA NAIP. Terrain: USGS 3D Elevation Program. Map details and finished artwork: KNOWOL.
The Details
About This Print
Choose an archival matte print, or a black or white Ayous wood frame. The archival matte print is unframed.
Select your size and finish above to see the matching product image and price.
Materials & Craftsmanship
A contemporary map with the character of a classic atlas, printed on archival matte paper. Optional frames are made from Ayous wood.
Your printed map does not include the watermark shown in the full-map preview.
Shipping & Delivery
Free shipping within the United States. Every print is made to order in the USA.
Buying a gift? Add a note in your cart and we'll include it. We never put prices in the package.
Prints ship within 2 to 3 business days. Allow 7 to 10 days total from ordering for delivery. Timing may vary during holidays or periods of high order volume.
Read our shipping policy.
Returns and damaged prints
Each print is made to order. Change-of-mind refunds are not available after production.
If your print arrives damaged, misprinted or incorrect, contact support@knowol.com within 30 days of receiving it. Include your order number, photos and a description of the issue.
Read our full refund and replacement policy. For questions about your order, email support@knowol.com.












