Find your street

Names on the Gantt map

Every name below is printed on this map. Look for your street, your school, the park where you played, or the pond down the road.

Places and landmarks23

  • Athelone Heights
  • Belle Meade
  • Brookforest Estates
  • Chanticleer
  • Cutler Ridge
  • Dreher Colony
  • Fairfield Acres
  • Glendale
  • Holly Springs
  • Lakeside
  • Paramount Park
  • Park Lane Terrace
Show all 23 places
  • Pecan Terrace
  • Pine Hill Village
  • Pleasant Valley
  • Rockvale
  • Roseman Heights
  • South Forest Estates
  • Spring Brook Terrace
  • The Highlands
  • West Gantt
  • Woodfield Heights
  • Woodfields

Streets and roads212

  • Augusta Road
  • White Horse Road
  • Grove Road
  • Piedmont Road
  • Piedmont Highway
  • West Lenhardt Road
  • Lenhardt Road
  • Frontage Road
  • Line Street
  • Sf-23
  • State Frontage Road 1118
  • James Drive
  • Murrell Road
  • Hidden Hills Trail
  • Hidden Hills Drive
  • High Valley Boulevard
  • Patton Road
  • Bruce Road
  • Blassingame Road
  • Old Grove Road
  • South Fairfield Road
  • Jacobs Road
  • Beechtree Boulevard
  • Pine Creek Drive
  • Crestfield Road
  • Crosby Circle
  • Evelyn Drive
  • Davis Road
  • Chapman Road
  • Camden Drive
Show all 212 streets
  • Old Augusta Road
  • East Fairfield Road
  • Bracken Road
  • Conestee Road
  • Willimon Drive
  • Rockvale Drive
  • Dixie Circle
  • Pine Creek Court Extension
  • Kenmore Drive
  • North Old Grove Road
  • Fairmont Drive
  • Abelia Meadows Drive
  • Rosalee Drive
  • Blossom Drive
  • Elcon Drive
  • South Estate Drive
  • Foxhall Road
  • Baker Road
  • D-237
  • Hoston Drive
  • East Seven Oaks Drive
  • Bluff Drive
  • Whitmire Drive
  • Park Circle
  • Pine Ridge Drive
  • Morningside Drive
  • Creekside Drive
  • Cambridge Drive
  • Rosemond Drive
  • Ridgeway Drive
  • Centre Boulevard
  • Uneeda Drive
  • Gantt Drive
  • Burmaster Drive
  • Whiller Drive
  • Mauldin Road
  • Lowood Lane
  • Knox Street
  • Michaux Drive
  • Creek Shore Drive
  • Alpha Drive
  • Sandra Street
  • Abbot Trail
  • D-Pd-34
  • Reeves Avenue
  • Woodmont Circle
  • Harvard Drive
  • Lynch Drive
  • Shackelford Road
  • Miami Avenue
  • Edgefield Road
  • Driver Avenue
  • North Kings Road
  • Burty Road
  • Lawson Way
  • Miracle Drive
  • Oakvale Drive
  • Gayle Street
  • Citadel Street
  • Henry Drive
  • Helen Street
  • Englewood Drive
  • Athelone Avenue
  • D-Pd-27
  • South Burty Road
  • Saxon Drive
  • Serenity Lane
  • Greencove Drive
  • Apple Drive
  • Cartee Avenue
  • Dryden Avenue
  • Maudie Street
  • Brown Road
  • Shasta Drive
  • Linda Avenue
  • Lermann Drive
  • Luke Lane
  • Megan Court
  • York Circle
  • Lydia Street
  • June Lane
  • Milford Lane
  • Malone Street
  • O-Pd-37
  • Alvin Drive
  • Belle Court
  • Ware Street
  • South Pleasantburg Drive
  • Avon Drive
  • Aladdin Manor
  • Stratford Road
  • East Castle Drive
  • West Castle Drive
  • Plainfield Circle
  • Chalmers Road
  • Theresa Drive
  • Marlboro Drive
  • Glendale Street
  • Mooremont Avenue
  • Daisy Drive
  • Bracken Woods Way
  • Old Murrell Road
  • South Wingate Road
  • Holbrook Trail
  • Paper Mill Road
  • Antioch Drive
  • Porcher Circle
  • Woodmede Way
  • Sherman Lane
  • Ghana Drive
  • Centerfield Street
  • Datastream Plaza
  • Kennedy Drive
  • Holder Lane
  • Uneeda Court
  • White Horse Court
  • Pine Creek Court
  • Brookview Drive
  • Carly Drive
  • Wyoming Avenue
  • Wisconsin Avenue
  • Silver Spur Court
  • Maxwell Avenue
  • Winston Avenue
  • Hillcrest Street
  • Saville Court
  • Midway Road
  • Davis Grove Lane
  • Pearls Lane
  • Milton Drive
  • West Faris Road
  • Fed Ex Way
  • Solar Drive
  • Lowry Road
  • Dorr Drive
  • Jeff Street
  • Alva Street
  • Plum Drive
  • Plantation Road
  • Brantford Lane
  • Abraham Drive
  • West Gantt Circle
  • Garden Trail
  • Collinson Road
  • North Estate Drive
  • Ellcon Court
  • Gettysburg Street
  • Maggie Street
  • Bartram Grove
  • Sutters Mill Drive
  • East Lenhardt Road
  • Stoney Point Drive
  • Chapman Place
  • Timber Leaf Drive
  • Gilbert Court
  • Burbank Court
  • Katrina Court
  • Berry Street
  • Pinefield Drive
  • West Seven Oaks Drive
  • Berkmans Lane
  • West Dorchester Boulevard
  • Buffalo Drive
  • Cypress Hollow Trail
  • Randolph Street
  • Freestone Street
  • North Kings Court
  • Misty Forest Way
  • Piney Woods Lane
  • Georgianna Lane
  • McCullough Road
  • Micrin Drive
  • French Lane
  • Westbrook Lane
  • Hickory Forest Trail
  • South Beaver Lane
  • Chamberlain Court
  • Valley View Drive
  • Williams Drive
  • Terry Court
  • Centre Court
  • Anthony Place

Names are listed as they appear on the printed map. Zoom into the product photos to find them.

About Gantt, South Carolina

From the Greenville County Schools: "The Gantt Community was named in honor of Richard Gantt, who was born on August 2, 1767 in Prince George County, Maryland."

Keep exploring South Carolina

Gantt is one of 540 South Carolina towns we've mapped. Every dot on the map is a print of its own.

The search covers every state, South Carolina first.

Near Gantt

Order 2 or more town maps and save 10%. Shown in the size and finish you picked above, so they hang as a set.

  • Dunean 12" x 18" / Archival Matte Print $39.99
  • Conestee 12" x 18" / Archival Matte Print $39.99
  • Judson 12" x 18" / Archival Matte Print $39.99

More maps nearby: Welcome, West End, Greenville, Golden Grove and Mauldin.

See all 540 South Carolina maps, A to Z

The art of mapping a place

How This Map Was Made

Real places. Remarkable detail. Discover the layers that turn geographic data into a map of home.

  1. Aerial imagery of Mendon, Massachusetts, from the USDA NAIP program

    The view from above

    Aerial imagery reveals the character of the land: woodland, open fields, and the patterns of a place.

  2. USGS elevation data rendered as shaded relief of Mendon, Massachusetts

    The shape of the land

    Elevation data brings hills, valleys, and subtle changes in the landscape into view.

  3. Closeup of roads, waterways, and buildings on the Mendon, Massachusetts map

    The details of home

    Roads, waterways, and building footprints come together to make the map feel unmistakably local.

  4. Finished Mendon, Massachusetts map shown in a black frame

    Geography becomes art

    Considered color, shading, and typography bring the layers together in a map made for your wall.

Process illustrated with Mendon, Massachusetts. Aerial imagery: USDA NAIP. Terrain: USGS 3D Elevation Program. Map details and finished artwork: KNOWOL.

The Details

About This Print

Choose an archival matte print, or a black or white Ayous wood frame. The archival matte print is unframed.

Select your size and finish above to see the matching product image and price.

Materials & Craftsmanship

A contemporary map with the character of a classic atlas, printed on archival matte paper. Optional frames are made from Ayous wood.

Your printed map does not include the watermark shown in the full-map preview.

Shipping & Delivery

Free shipping within the United States. Every print is made to order in the USA.

Buying a gift? Add a note in your cart and we'll include it. We never put prices in the package.

Prints ship within 2 to 3 business days. Allow 7 to 10 days total from ordering for delivery. Timing may vary during holidays or periods of high order volume.

Read our shipping policy.

Returns and damaged prints

Each print is made to order. Change-of-mind refunds are not available after production.

If your print arrives damaged, misprinted or incorrect, contact support@knowol.com within 30 days of receiving it. Include your order number, photos and a description of the issue.

Read our full refund and replacement policy. For questions about your order, email support@knowol.com.